Pureflow Bio

Pureflow Bio · Manufacturer in India

Degassing Towers

Degassing towers increase air-water contact to support removal of excess dissolved gases. Pureflow Bio manufactures degassing equipment in India for RAS, hatchery and aquarium treatment systems.

Made in IndiaOne-year warrantyDispatch within 15 working days
Degassing Towers assembly and visible equipment arrangement
Equipment illustration. Confirm your supplied configuration in the quotation and approved drawing.

What are Degassing Towers?

A degassing tower brings water into contact with an air stream to support the removal of dissolved gases under a defined operating duty.

The DGT hydraulic flow listing does not guarantee a CO2-removal rate at unspecified inlet and air conditions.

Degassing Towers applications

High-density RAS farms

Best for a measured dissolved-gas duty within the circulation loop.

Hatcheries

Best for reviewing source-water and process-water gas conditions.

Aquariums and research facilities

Best for a defined inlet condition and target outlet condition.

How Degassing Towers work

Step 1

Distribute the incoming water

Spread the design flow through the agreed contact arrangement.

Step 2

Contact the air stream

Bring air and water together through the specified media and free-space sections.

Step 3

Collect and ventilate

Return water through the outlet and discharge the gas-bearing air through the planned route.

Degassing Towers features and benefits

Air-water contact stage

Provides a planned route for dissolved-gas exchange.

Catalogue hydraulic range

Offers four DGT vessel listings for dimensional comparison.

Blower arrangement

Supports the air duty stated in the agreed design.

Accessible vessel connections

Helps coordinate water levels and service access.

Degassing Towers models and specifications

DGT hydraulic and dimensional listings

DGT hydraulic and dimensional listings
ModelTank diameter (mm)Tank height (mm)Inlet diameter (mm)Outlet diameter (mm)Maximum water flow (m³/h)Overall height listed (mm)Media volumeOutlet height (mm)Inlet height (mm)Enquiry
DGT-255003630140140253950Confirm unit: 110 listed1503350Enquire about DGT-25
DGT-507503750160160504100Confirm unit: 140 listed1753400Enquire about DGT-50
DGT-100100038202002001003850Confirm unit: 160 listed2503470Enquire about DGT-100
DGT-150125039502202201503970Confirm unit: 200 listed2503560Enquire about DGT-150
The catalogue labels media volume as 110–200 m³, inconsistent with the listed vessel dimensions. Media volume is therefore marked for confirmation rather than silently relabelled as litres. Overall and tank heights also require drawing confirmation.

Configuration and supply details

Confirm materials, connection standard, dimensions, electrical requirements and included components for the selected equipment. The quotation defines current pricing and the approved scope.

Optional components

  • Blower and air arrangement
  • Cleaning arrangement only when specified

Options are supplied only when included in the agreed quotation.

How to select Degassing Towers

The DGT hydraulic flow listing does not guarantee a CO2-removal rate at unspecified inlet and air conditions.

Selection example

For a proposed flow of 50 m³/h, DGT-50 has a listed maximum flow of 50 m³/h. Separately check inlet CO₂, target CO₂, air supply and packing; a hydraulic match alone is not a gas-removal guarantee.

  • Water flow and temperature
  • Measured inlet CO2 and other dissolved gases
  • Target outlet conditions
  • Airflow and ventilation route
  • Available head and service clearance

Build your degassing towers enquiry brief

Record your design requirements for review. This tool does not calculate an unverified treatment capacity or automatically approve a model.

Degassing Towers installation and maintenance

Installation and integration

Check the support, inlet elevation and gravity outlet route. Direct the exhaust air through the agreed ventilation arrangement and allow access to the contact internals.

Routine maintenance

Inspect distribution and media for fouling, and service the installed blower. Track inlet and outlet water conditions to verify operation against the project duty.

Warranty, dispatch and installation

One-year equipment warranty

Confirm coverage and operating requirements in the quotation.

Dispatch within 15 working days

Dispatch follows order confirmation. Transport and site delivery time are additional.

Made in India

Manufactured by Pureflow Bio in Mysuru, Karnataka. Installation, commissioning and service across India are agreed for your project.

For complete turnkey projects, confirm the project schedule, utilities, site preparation, installation and commissioning responsibilities separately.

Request a Degassing Towers quote

Share your application, preferred model and site requirements. Pureflow Bio will confirm the selected configuration and scope in your quotation.

    Fields marked * are required.






    Your enquiry is sent securely to our team so we can respond to your requirements. Please do not include passwords, payment details or other sensitive information.

    Degassing Towers FAQs

    What are degassing towers?

    A degassing tower brings water into contact with an air stream to support the removal of dissolved gases under a defined operating duty.

    Where can degassing towers be used?

    High-density RAS farms — Best for a measured dissolved-gas duty within the circulation loop. Hatcheries — Best for reviewing source-water and process-water gas conditions. Aquariums and research facilities — Best for a defined inlet condition and target outlet condition.

    How should I select degassing towers?

    The DGT hydraulic flow listing does not guarantee a CO2-removal rate at unspecified inlet and air conditions. Supply water flow and temperature, measured inlet co2 and other dissolved gases, target outlet conditions, airflow and ventilation route, available head and service clearance.

    Which degassing towers specifications should I confirm?

    The catalogue labels media volume as 110–200 m³, inconsistent with the listed vessel dimensions. Media volume is therefore marked for confirmation rather than silently relabelled as litres. Overall and tank heights also require drawing confirmation.

    What options are available for degassing towers?

    Discuss Blower and air arrangement, Cleaning arrangement only when specified. Only items stated in your quotation are included.

    How are degassing towers installed?

    Check the support, inlet elevation and gravity outlet route. Direct the exhaust air through the agreed ventilation arrangement and allow access to the contact internals.

    What maintenance do degassing towers need?

    Inspect distribution and media for fouling, and service the installed blower. Track inlet and outlet water conditions to verify operation against the project duty.

    What warranty and dispatch terms apply?

    Equipment carries a one-year warranty, with dispatch within 15 working days after order confirmation. Transit time is additional. Confirm coverage, site installation, commissioning and delivery responsibilities in the quotation; custom turnkey project schedules are agreed separately.

    Plan your complete aquaculture or aquarium system

    Connect degassing towers to the wider treatment process

    Discuss equipment integration, utilities and a coordinated project scope with Pureflow Bio.

    Scroll to Top